◆ Projects

Sites we've
helped come back.

A selection of completed and active programs across India — from coastal wetlands to urban lakes and renewable infrastructure.

All projects
OngoingBio-Remediation

Jakkur Lake Bio-Remediation

Active bio-remediation of a hyper-eutrophic urban lake at Kalyani Point, Jakkur. MIW Bacillus consortium dosing reverses thick green algal bloom and restores compliant water chemistry to NGT 2019 standards.

Location
Bengaluru, Karnataka
Year
2026
Client
Bangalore Water Supply & Sewerage Board (BWSSB)
Scope
Urban lake · Kalyani Point, Jakkur
Duration
Phase I — active
Jakkur Lake Bio-Remediation

7.2 mg/L

BOD achieved

36 mg/L

COD achieved

33

Days to compliance

◆ The challenge

What we
walked into.

The urban lake had collapsed under chronic sewage inflow and stormwater loading — hyper-eutrophic column, DO close to zero, algal mats over open water, and odour complaints from residents. The site sits inside a dense neighbourhood, so any intervention had to be chemical-free, low-noise, and safe for the surrounding community.

◆ Before · After

The shift, in one frame.

Jakkur Lake Bio-Remediation — before
Before

Baseline

Hyper-eutrophic · thick algal mat · DO collapsed

Jakkur Lake Bio-Remediation — after
After

Outcome state

Compliant outflow · NGT 2019 · clarity returning

◆ Our approach

Calibrated,
not generic.

  1. 01

    MIW Bacillus consortium dosing

    A site-specific Bacillus consortium is dosed at the inflow and open-water zones, with initial bacterial activation in under 30 minutes — no synthetic chemicals, no sediment dredging, no disruption to the shoreline.

  2. 02

    Facultative-to-aerobic phase shift

    Bacterial growth drives organic-matter breakdown through nitrification and denitrification, lifting dissolved oxygen and breaking the H₂S / phosphorus loop that fuels the algal bloom.

  3. 03

    NABL-accredited compliance dossier

    Weekly grab samples by certified field officers, paired with NABL-accredited lab analysis, build a live compliance dossier against NGT 2019 and CPCB norms — no retrofit reporting at handover.

◆ Outcome

By the end of the treatment window the lake sits inside NGT 2019 / CPCB inland-surface-water limits — BOD, COD, ammonical N and total N all pulled back into compliance range, with algal cover visibly retreating from the inflow corridor and column clarity returning to the open-water zone.

◆ Have a similar site?

Let's design the
recovery program.

Talk to our team

Have a site that needs restoration?

Talk to our team