A selection of completed and active programs across India — from coastal wetlands to urban lakes and renewable infrastructure.

01Jakkur Lake Bio-RemediationBio-Remediation
02Vibhuthipura Lake Bio-RemediationBio-Remediation
03Dasarahalli Lake Bio-RemediationBio-Remediation
04Kowdenahalli Lake Bio-RemediationBio-Remediation
05Seegehalli Lake Bio-RemediationBio-Remediation
06Venghainakere Lake Bio-RemediationBio-Remediation
07Bagalagunte Lake Bio-RemediationBio-Remediation
08Chikkabasanapura Lake Bio-RemediationBio-Remediation
09Chikka Bellandur Lake Bio-RemediationBio-Remediation
10Gunjur Palya Lake Bio-RemediationBio-Remediation
11Gunjur–Carmelaram Lake Bio-RemediationBio-Remediation
12Mangammanapalya Lake Bio-RemediationBio-Remediation
13Ponniamman Kulam Bio-RemediationBio-Remediation
14Pullakeni Kulam Bio-RemediationBio-Remediation
15Singa Naikar Kulam Bio-RemediationBio-Remediation
16Thiru Vi Ka Kulam Bio-RemediationBio-Remediation
17Vaiyapuri Kulam Bio-RemediationBio-Remediation
18Shalimar Kulam Bio-RemediationBio-Remediation
01Jakkur Lake Bio-RemediationBio-Remediation
02Vibhuthipura Lake Bio-RemediationBio-Remediation
03Dasarahalli Lake Bio-RemediationBio-Remediation
04Kowdenahalli Lake Bio-RemediationBio-Remediation
05Seegehalli Lake Bio-RemediationBio-Remediation
06Venghainakere Lake Bio-RemediationBio-Remediation
07Bagalagunte Lake Bio-RemediationBio-Remediation
08Chikkabasanapura Lake Bio-RemediationBio-Remediation
09Chikka Bellandur Lake Bio-RemediationBio-Remediation
10Gunjur Palya Lake Bio-RemediationBio-Remediation
11Gunjur–Carmelaram Lake Bio-RemediationBio-Remediation
12Mangammanapalya Lake Bio-RemediationBio-Remediation
13Ponniamman Kulam Bio-RemediationBio-Remediation
14Pullakeni Kulam Bio-RemediationBio-Remediation
15Singa Naikar Kulam Bio-RemediationBio-Remediation
16Thiru Vi Ka Kulam Bio-RemediationBio-Remediation
17Vaiyapuri Kulam Bio-RemediationBio-Remediation
18Shalimar Kulam Bio-RemediationBio-Remediation
18

Projects in view

00

Completed

18

Ongoing

09

Regions

01 / 18Ongoing

Bio-Remediation · 2026

Jakkur Lake Bio-Remediation

Bengaluru, Karnataka

Active bio-remediation of a hyper-eutrophic urban lake at Kalyani Point, Jakkur. MIW Bacillus consortium dosing reverses thick green algal bloom and restores compliant water chemistry to NGT 2019 standards.

7.2 mg/L

BOD achieved

36 mg/L

COD achieved

33

Days to compliance

Open case study
Jakkur Lake Bio-Remediation — after
Jakkur Lake Bio-Remediation — before
Before
After
Drag to compare
02 / 18Ongoing

Bio-Remediation · 2026

Vibhuthipura Lake Bio-Remediation

LBS Nagar, Bengaluru

MIW Bacillus consortium dosing across Vibhuthipura Lake, executed under BWSSB with NABL-accredited water testing. Column pulled back inside CPCB inland-surface-water limits on pH, COD, and total nitrogen.

8.9

pH

49 mg/L

COD

3.4 mg/L

Total N

Open case study
Vibhuthipura Lake Bio-Remediation — after
Vibhuthipura Lake Bio-Remediation — before
Before
After
Drag to compare
03 / 18Ongoing

Bio-Remediation · 2025

Dasarahalli Lake Bio-Remediation

T. Dasarahalli, Bengaluru

Green-algal-loaded urban lake off KIADB Road treated with site-tuned MIW Bacillus consortium under BWSSB, with weekly sampling and NABL-accredited compliance analysis.

Reduced

Algal load

Weekly

Sampling

NGT 2019

Compliance

Open case study
Dasarahalli Lake Bio-Remediation — after
Dasarahalli Lake Bio-Remediation — before
Before
After
Drag to compare
04 / 18Ongoing

Bio-Remediation · 2025

Kowdenahalli Lake Bio-Remediation

Ramamurthy Nagar, Bengaluru

Bacterial-consortium dosing at Kowdenahalli Lake in Ramamurthy Nagar. Sampling and lab-analysis dossier logged against NGT 2019 for BWSSB reporting.

Rising

DO trend

Eliminated

Odour

NABL

Reporting

Open case study
Kowdenahalli Lake Bio-Remediation — after
Kowdenahalli Lake Bio-Remediation — before
Before
After
Drag to compare
05 / 18Ongoing

Bio-Remediation · 2025

Seegehalli Lake Bio-Remediation

Krishnarajapuram, Bengaluru

Consortium dosing along the Seegehalli Lake bund in Hosabasavanapura, reversing algal bloom and restoring column clarity in the open-water zone.

Retreating

Algal cover

Improving

Clarity

Weekly

Sampling

Open case study
Seegehalli Lake Bio-Remediation — after
Seegehalli Lake Bio-Remediation — before
Before
After
Drag to compare
06 / 18Ongoing

Bio-Remediation · 2025

Venghainakere Lake Bio-Remediation

Krishnarajapuram, Bengaluru

IBC-tank based bacterial dosing along Venghainakere Lake shoreline. Field officers rotate application points across the bund to keep the column populated with active consortium.

Rotational

Bund dosing

Eliminated

Odour

NABL

Reporting

Open case study
Venghainakere Lake Bio-Remediation — after
Venghainakere Lake Bio-Remediation — before
Before
After
Drag to compare
07 / 18Ongoing

Bio-Remediation · 2025

Bagalagunte Lake Bio-Remediation

Bengaluru, Karnataka

Supply of eco-friendly treated water from the 20 MLD Nagasandra STP paired with in-lake bacterial-consortium dosing to stabilise Bagalagunte Lake water chemistry.

20 MLD

STP feed

BWSSB

Programme

NGT 2019

Compliance

Open case study
Bagalagunte Lake Bio-Remediation — after
Bagalagunte Lake Bio-Remediation — before
Before
After
Drag to compare
08 / 18Ongoing

Bio-Remediation · 2025

Chikkabasanapura Lake Bio-Remediation

Bengaluru, Karnataka

300 mm DI pipeline and pump station brings treated water from Yellamallappa Chetty to Chikkabasanapura Lake, with in-lake bacterial-consortium dosing to hold compliant chemistry.

300 mm DI

Pipeline

BWSSB

Programme

NGT 2019

Compliance

Open case study
Chikkabasanapura Lake Bio-Remediation — after
Chikkabasanapura Lake Bio-Remediation — before
Before
After
Drag to compare
09 / 18Ongoing

Bio-Remediation · 2025

Chikka Bellandur Lake Bio-Remediation

Bengaluru, Karnataka

200 mm and 100 mm DI K-9 pipeline tap from the 300 mm feed line to Chikka Bellandur Lake, coupled with bacterial-consortium dosing to arrest eutrophication.

200/100 mm DI

Pipeline

BWSSB

Programme

NGT 2019

Compliance

Open case study
Chikka Bellandur Lake Bio-Remediation — after
Chikka Bellandur Lake Bio-Remediation — before
Before
After
Drag to compare
10 / 18Ongoing

Bio-Remediation · 2025

Gunjur Palya Lake Bio-Remediation

Bengaluru, Karnataka

Bacterial-consortium dosing and eco-friendly treated-water supply to Gunjur Palya Lake, executed under BWSSB.

BWSSB

Programme

Consortium

Dosing

Weekly

Sampling

Open case study
Gunjur Palya Lake Bio-Remediation — after
Gunjur Palya Lake Bio-Remediation — before
Before
After
Drag to compare
11 / 18Ongoing

Bio-Remediation · 2025

Gunjur–Carmelaram Lake Bio-Remediation

Bengaluru, Karnataka

Bio-remediation of the Gunjur–Carmelaram lake system through consortium dosing and treated-water inflow control under BWSSB.

BWSSB

Programme

Consortium

Dosing

NGT 2019

Compliance

Open case study
Gunjur–Carmelaram Lake Bio-Remediation — after
Gunjur–Carmelaram Lake Bio-Remediation — before
Before
After
Drag to compare
12 / 18Ongoing

Bio-Remediation · 2025

Mangammanapalya Lake Bio-Remediation

Bommanahalli, Bengaluru

Bacterial-consortium dosing at Mangammanapalya Lake in Bommanahalli under BWSSB, holding the column inside NGT 2019 compliance envelope.

BWSSB

Programme

Consortium

Dosing

NGT 2019

Compliance

Open case study
Mangammanapalya Lake Bio-Remediation — after
Mangammanapalya Lake Bio-Remediation — before
Before
After
Drag to compare
13 / 18Ongoing

Bio-Remediation · 2025

Ponniamman Kulam Bio-Remediation

Zone 11, Chennai

MIW Bacillus consortium dosing across Ponniamman Kulam under Greater Chennai Corporation, Zone 11, Ward 150. Chemical-free treatment with before/after photo dossier and CD submission.

1 year

Contract

11 · Ward 150

Zone

GCC

Programme

Open case study
Ponniamman Kulam Bio-Remediation — after
Ponniamman Kulam Bio-Remediation — before
Before
After
Drag to compare
14 / 18Ongoing

Bio-Remediation · 2025

Pullakeni Kulam Bio-Remediation

Zone 11, Chennai

One-year GCC contract to clean Pullakeni Kulam with MIW Bacillus consortium dosing, monitored by ward Assistant Engineer with photo dossier and third-party analysis.

1 year

Contract

11

Zone

GCC

Programme

Open case study
Pullakeni Kulam Bio-Remediation — after
Pullakeni Kulam Bio-Remediation — before
Before
After
Drag to compare
15 / 18Ongoing

Bio-Remediation · 2025

Singa Naikar Kulam Bio-Remediation

Valasaravakkam, Chennai

Bio-augmented cleaning of Singa Naikar Kulam in Valasaravakkam through MIW Bacillus consortium dosing under Greater Chennai Corporation.

1 year

Contract

11

Zone

GCC

Programme

Open case study
Singa Naikar Kulam Bio-Remediation — after
Singa Naikar Kulam Bio-Remediation — before
Before
After
Drag to compare
16 / 18Ongoing

Bio-Remediation · 2025

Thiru Vi Ka Kulam Bio-Remediation

Valasaravakkam, Chennai

Consortium dosing and monitored bio-remediation of Thiru Vi Ka Kulam in Valasaravakkam under Greater Chennai Corporation.

1 year

Contract

11

Zone

GCC

Programme

Open case study
Thiru Vi Ka Kulam Bio-Remediation — after
Thiru Vi Ka Kulam Bio-Remediation — before
Before
After
Drag to compare
17 / 18Ongoing

Bio-Remediation · 2025

Vaiyapuri Kulam Bio-Remediation

Chennai

Year-long GCC contract for MIW Bacillus consortium dosing at Vaiyapuri Kulam, with photo dossier, CD submission, and NABL-accredited analysis.

1 year

Contract

GCC

Programme

NABL

Reporting

Open case study
Vaiyapuri Kulam Bio-Remediation — after
Vaiyapuri Kulam Bio-Remediation — before
Before
After
Drag to compare
18 / 18Ongoing

Bio-Remediation · 2025

Shalimar Kulam Bio-Remediation

Chennai

MIW Bacillus consortium dosing at Shalimar Kulam under Greater Chennai Corporation — chemical-free treatment with pre- and post-work water-quality analysis.

1 year

Contract

GCC

Programme

NABL

Reporting

Open case study
Shalimar Kulam Bio-Remediation — after
Shalimar Kulam Bio-Remediation — before
Before
After
Drag to compare