OngoingBio-Remediation

Venghainakere Lake Bio-Remediation

IBC-tank based bacterial dosing along Venghainakere Lake shoreline. Field officers rotate application points across the bund to keep the column populated with active consortium.

Location
Krishnarajapuram, Bengaluru
Year
2025
Client
Bangalore Water Supply & Sewerage Board (BWSSB)
Scope
Urban lake · shoreline dosing
Duration
Active phase
Venghainakere Lake Bio-Remediation

Rotational

Bund dosing

Eliminated

Odour

NABL

Reporting

◆ The challenge

What we
walked into.

The urban lake had collapsed under chronic sewage inflow and stormwater loading — hyper-eutrophic column, DO close to zero, algal mats over open water, and odour complaints from residents. The site sits inside a dense neighbourhood, so any intervention had to be chemical-free, low-noise, and safe for the surrounding community.

◆ Before · After

The shift, in one frame.

Venghainakere Lake Bio-Remediation — before
Before

Baseline

Hyper-eutrophic · thick algal mat · DO collapsed

Venghainakere Lake Bio-Remediation — after
After

Outcome state

Compliant outflow · NGT 2019 · clarity returning

◆ Our approach

Calibrated,
not generic.

  1. 01

    MIW Bacillus consortium dosing

    A site-specific Bacillus consortium is dosed at the inflow and open-water zones, with initial bacterial activation in under 30 minutes — no synthetic chemicals, no sediment dredging, no disruption to the shoreline.

  2. 02

    Facultative-to-aerobic phase shift

    Bacterial growth drives organic-matter breakdown through nitrification and denitrification, lifting dissolved oxygen and breaking the H₂S / phosphorus loop that fuels the algal bloom.

  3. 03

    NABL-accredited compliance dossier

    Weekly grab samples by certified field officers, paired with NABL-accredited lab analysis, build a live compliance dossier against NGT 2019 and CPCB norms — no retrofit reporting at handover.

◆ Outcome

By the end of the treatment window the lake sits inside NGT 2019 / CPCB inland-surface-water limits — BOD, COD, ammonical N and total N all pulled back into compliance range, with algal cover visibly retreating from the inflow corridor and column clarity returning to the open-water zone.